A Wiffle Ball Field for Kids Is Coming to Camden Yards, Plus a Treehouse Mascot Zone and Modernized Suites

Kids will soon get to swing for the fences at Camden Yards, on a field their own size. The Baltimore Orioles announced the next round of renovations at Oriole Park on Tuesday, and the headline piece is a new Kids Zone built where the bullpen picnic area sits, with a scaled-down version of the ballpark, Wiffle ball sets, a dugout for families, and play structures modeled after the city skyline and the B&O Warehouse.

Next door, between Gates G and F beyond left field, an underused ticket office becomes the Birdhouse, a treehouse-inspired mascot meet-and-greet spot where young fans can hang out with the Oriole Bird. It connects straight into the new Kids Zone.

The rest of the work touches just about everybody. Suites 9 through 31 get new finishes and furnishings, with select suites combined into larger spaces, plus accessibility improvements. Club Level restrooms get tiled walls and floors in the style of last season’s renovated restrooms, main concourse restrooms get new flooring, paint, and lighting, and a former storage area becomes a modern dining room and kitchen for players and staff.

“The updates to some of our most utilized areas will be an incredible boost to the overall experience for fans of all ages throughout Birdland,” Orioles president of business operations Catie Griggs said in a statement. Governor Wes Moore added that the renovations are proof of continued investment in a franchise that drives local jobs and fuels Baltimore’s economy.

This round follows September’s reveal of the left field upper deck project, which removes about 2,000 seats for a social space with drink rails, standing room, a central bar, and TVs, bringing the park’s new capacity to 40,234. The work builds on the team’s 2024 lease and the $600 million in state bonds approved for stadium upgrades.

Source: South Baltimore Peninsula

⚓ Pass it on